GOLIATH GOLD PROJECT – 3D MODELS
1. Drill Holes in Press Release 21/06/10
Thunder Lake Gold Deposit: Main Zone, Looking North
Longitudinal Section: contoured Gold Grade x Thickness
Modelled Strike: 2,450 metres (west to northeast in plane of Main Zone)
Modelled Max. Depth: 800 metres

This 3D model shows the contoured gram-metres [grade (g/t Au) x thickness (metres)] in the Main Zone of the Thunder Lake gold deposit, with the drill holes from the Press Release of June 21, 2010.
Instructions for Viewing
The 3D models can be viewed/manipulated by using a web browser plug-in “Cortona3D” and by following these instructions:
1. Download the 3D Viewer (Cortona3D plug-in).
2. Install the 3D Viewer on computer – launches through web browser.
3. Open 3D model (.wrl file).
|